Ask for portfolio evidence that matches the risk
Look for a project with a comparable integration, access boundary or operating constraint, not simply the same industry. Ask which part the supplier delivered, whether it was a prototype or a system in use, and what the customer accepted. Where confidentiality prevents a reference, ask for a redacted specification, a walkthrough or a clearly labelled sample. A demo shows design choices, not production reliability.
Compare architecture and estimates together
Ask for a context diagram and an estimate divided into discovery, delivery, third-party costs and support. Attach assumptions to each major cost: for example, whether the supplier has usable API documentation and test credentials. Compare what happens to the estimate if an assumption fails. Review data ownership, recovery, identity and migration alongside the main features.
For a portal, use the portal planning guide to give bidders a common set of roles, integrations and exception scenarios. Use the MVP scoping guide to define a first release that can be accepted on its own.
Set ownership and support before signing
Record who owns bespoke work, who licenses reusable components, and who controls repositories, deployment accounts and third-party subscriptions. Define acceptance by example, including an integration outage and a revoked account. Ask the supplier to demonstrate a restore or handover, and agree who handles incidents, patches and work that falls outside warranty.
Score bidders independently on evidence, technical fit, total cost and handover. If the bids still assume different products, agree a specification first. Enterprise systems design covers architecture and requirements; implementation is a separate decision.